Sunday, September 14, 2014

Works going on.

I got Sasha out of the water in Enkhuizen and started the engine installation.  All mechanical parts, exhaust,  inlets needed replacement, and the foundation of the engine was redone. The works are undergoing :) 
The engine fits perfect after cutting the old engine foundation. There is an easy access to all of the filters.
The connection of the shaft to the engine was done by flanch.
The support of the shaft and the shaft tube was rotten, new support was built in. New tube and new shaft were installed.
New propeller installed :)
Isn't she a beauty :)

No comments:

Post a Comment