Saturday, December 6, 2014

Rebedding the deck hardware

It was a lovely day today in the Marina Den Oever (the name of the American city Denver originates from over here :). I decided to rebed all the deck hardware, stanchions, cleats, and chain plates :)
Lovely evening in Marina Den Oever
Rebedding hardware.

Saturday, November 29, 2014

Re-bedding the chain plates with poly butyl tape.

I decided before the winter really comes to re-bed the chain plates. In the Don Casey book "Sailboat Maintenance Manual" actually the recommended material is polysulfide sealant. I visited more than 5 shops here in Netherlands, and I did not find such a sealant. Because of that, I started to look for alternatives. I found several reviews and sailors in Internet who actually recommend the use of polybutyl tape when sealing movable deck hardware like the chain plates and stanchions. I found such a tape in the shop called KOK-Watersport: poly butyl tape KOK watersport. 3 meters of it cost just 6.50 Euro. The procedure which I found is pretty basic. 

1. Remove chain plates.
2. Clean and Dry chain plates and the through holes.
3. Repair the deck with epoxy if necessary.     
4. Apply the poly butyl tape.
5. Tighten the chain plates.
6. Remove the excess of the poly butyl tape.

Cleaned chain plate.
Poly butyl tape applied.
Tightened chain plate.
Removing the excess of the sealant.

Sunday, September 28, 2014

Rigging Notes

I just checked the rigging tension. Decided to make everything on 10% of ultimate breaking strength except for the capping shrouds which were set to 15%. I found the information about rigging here:
The explanation which I liked the most was the following:
"Note From Nigel Charlesworth (UK) regarding accurate mast rake.
I have a measured drawing of Birgitta (Rogers CO26) which shows the original configuration and the modifications required to achieve a 2 degree mast rake. It meant chopping 125 mm off the backstays (dia = 4 mm) and increasing the forestay length (dia = 5 mm) by 110 mm. I used Staloks. No changes were made to the capping or the lower shrouds. The standing rigging was re-tensioned, using a “Sure-Rig” tension meter as follows: everything 10% of ultimate breaking strength except for the capping shrouds which were set to 15%. When this was all done, the main halyard was dropped to the deck into a bucket of water and the distance from its bottom to the mast step was measured and found to be 295 mm which gives a 2 degree rake. Birgitta was put on the water, sailed and the standing rigging re-tensioned. Prior to any of this we were tacking through 115 degrees. Post static tensioning we tacked through 90 degrees, and after the dynamic re-tensioning we achieved 85 degrees in a 15 – 20 knot breeze. What was interesting was that it was the lower fore shrouds that create an automatic pre-bend. Equally interesting is that the flatter the sails the better the tack. By just slightly loosening the main and genoa luffs and easing the vang the tacking angle increases to 95 degrees."

Interior layout.

A lot of people ask me how Sasha looks from inside :) Here it is :)

Saturday, September 20, 2014

Works done, boat moved to Wadenzee

New engine works great. Smooth and quite :) Cruising speed 4.7 kn, maximal speed 5.5 kn. 1 liter per hour. Brilliant. Of course the first thing which I did was to fill the reservoir with gasoline instead of diesel. Took me some time to remove it and refill again :)

Very proud with the working original from 1976 Brooks and Gatehouse analog speed meter, log, and depth meter. Awesome :) 

 

Looks good :) 

Sunday, September 14, 2014

Works going on.

I got Sasha out of the water in Enkhuizen and started the engine installation.  All mechanical parts, exhaust,  inlets needed replacement, and the foundation of the engine was redone. The works are undergoing :) 
The engine fits perfect after cutting the old engine foundation. There is an easy access to all of the filters.
The connection of the shaft to the engine was done by flanch.
The support of the shaft and the shaft tube was rotten, new support was built in. New tube and new shaft were installed.
New propeller installed :)
Isn't she a beauty :)